In 2026, the canton of Vaud remains one of the most active in French-speaking Switzerland on heat pump grants. The cantonal Building Programme funds the replacement of oil, gas or electric heating, and some municipalities add their own grants. Owners often miss two things: the real amount they are entitled to (many do not know that geothermal is subsidised at CHF 20,000), and the procedure, which must be followed to the letter or the grant is lost.
This article sets out the official 2026 scale, the eligibility conditions, how to file the application, and the pitfalls we see most often on our sites between Rolle, Nyon, Lausanne and Yverdon.
For English-speaking owners in Vaud
The application forms and the decisions from the canton are in French. The terms you will meet most often:
- Programme Bâtiments: the Buildings Programme, the main source of heat pump grants.
- DGE-DIREN: the cantonal office that processes the applications.
- Demande de subvention: the grant application.
- Commune: your municipality, which may add its own grant.
See the regions we cover, or write to us in English about your project.
The Vaud Building Programme in 2026: the official scale
This is the main pillar of heat pump grants in the canton. Run by the cantonal energy directorate (DGE-DIREN), it is part of the national Buildings Programme, based on the harmonised cantonal funding model (ModEnHa), with a cantonal budget and specific rules. Two measures cover heat pumps, plus one complementary measure.
M-05, air-to-water heat pump (≤ 70 kW). Replacement of main heating running on oil, natural gas or fixed electric resistance.
| Situation | Grant |
|---|---|
| Single-family home or output ≤ 15 kW | CHF 5,000 |
| Other buildings and output > 15 kW | CHF 400/kW |
M-06, ground-source (geothermal) or water-to-water heat pump (≤ 70 kW). Same replacement logic, with a better heat source than outdoor air (geothermal probes, groundwater, lake water, ice storage).
| Situation | Grant |
|---|---|
| Output < 20 kW or single-family home | CHF 20,000 |
| Output > 20 kW | CHF 4,000 + CHF 800/kW |
When connected to an anergy network, these amounts are reduced by 50%.
The canton clearly favours geothermal. A geothermal system costs CHF 60,000 to CHF 75,000 for a house, all included, against CHF 32,000 to CHF 48,000 for an air-to-water unit. The CHF 15,000 difference in grants absorbs part of that gap, and the higher COP lowers the electricity bill every year. For a house with land, the question is worth asking.
IP-19, creating a hydronic distribution network. If your building has no hydronic distribution, typically when replacing direct electric radiators, creating the network (radiators or underfloor heating, pipes) is not covered by M-05 or M-06. It is a separate measure, IP-19, to be filed in parallel.
Source: official M-05 and M-06 fact sheets of the State of Vaud (vd.ch) and Building Programme 2026 conditions (version 1.1 of 12.01.2026). The subsidised output is capped at 50 W/m² of energy reference area before the work. The full scale is summarised in French on our page heat pump grants in Vaud.
The eligibility conditions to check before filing
The grant is only paid if the application meets the canton's conditions. The main ones:
- The heat pump replaces main heating running on oil, natural gas or fixed electric resistance. New buildings are not eligible.
- 100% renewable. After the work, heating and hot water must be fully covered by renewable energy. Hot water during the heating season must come from the heat pump or another renewable source (solar thermal, heat pump water heater).
- CECB® required for buildings from before 2000. The envelope must be rated A to E (A to C for buildings above 1,000 m in the case of an air-to-water heat pump). The CECB® must be updated after the work.
- Certified quality. Up to 15 kW, the heat pump must be installed to the heat pump system module standard; above that, a SwissEnergy performance guarantee and a quality label (EHPA or GSP) are required. For geothermal probes, the drilling company must hold the GSP label.
- Thermostatic valves on existing radiators.
At I.ON, the thermal assessment and the CECB® are part of preparing the application: these conditions are checked before filing, not discovered afterwards.
Municipal grants: the layer that makes the difference
Several Vaud municipalities have their own energy fund. Conditions, amounts and budgets change from one municipality and one year to the next, and some pay nothing. We therefore do not publish municipal amounts: they are checked at the time of filing.
Our advice: do not stop at the cantonal grant. A call or an email to your municipality's energy department, before signing, is enough to know whether a local grant applies.
The tax deduction
Principle. The net cost after subsidies is deductible from taxable income. The deduction applies to the year in which the invoices are actually paid, not the commissioning date.
Real impact. At a marginal rate of 25%, you recover 25% of the net cost; at 30%, 30%. Your rate depends on your income and municipality: check with your accountant.
Supporting documents. Keep all invoices, the commissioning report and the grant decisions. The tax return will ask for them.
The ideal timeline for a 2026 application
- Assessment and quote. Thermal assessment and detailed quote. For a building from before 2000, a CECB® drawn up or updated.
- Cantonal application. Filed online on the Building Programme portal: form signed by the owner, detailed quote, heat pump system module form (≤ 15 kW) or performance guarantee and quality label (> 15 kW), CECB®, and for geothermal the GSP-labelled driller's quote.
- Grant decision. DIREN reviews the application and notifies its decision. No order or delivery of equipment before this written approval.
- Municipal application. In parallel or just after, if your municipality has a grant.
- Order and work. Only after the grant decision.
- Completion notice. Filed on the same portal, with the commissioning report, paid invoices, the system module certificate where applicable and the updated CECB®. DIREN may inspect the installation.
- Grant payment. The canton pays once the file is validated.
- Tax return. Deduct the net unsubsidised cost.
The pitfalls that cost you grants
Ordering or taking delivery before written approval. The canton's rule is explicit: no work or purchase before the grant decision, and equipment counts as acquired as soon as it is delivered on site.
Dismissing geothermal out of habit. Many owners rule out drilling because of the extra cost, without knowing that the grant difference (CHF 20,000 against CHF 5,000) absorbs part of it. Price both options before deciding.
Forgetting IP-19. When replacing electric radiators, creating the hydronic network qualifies for a separate grant.
Discovering the CECB® too late. For a building from before 2000, an envelope rated A to E is required at filing. Finding out it is rated F delays the whole project, or means insulating first.
Forgetting the municipality. Some municipalities pay their own grant, and many owners never ask.
A worked example for 2026
Fictitious example: a 160 m² house in Rolle, a 22-year-old oil boiler, a need of about 10 kW. Gross prices are our published ranges; the municipal grant is left at zero, since it is not known in advance.
Option 1, air-to-water heat pump (M-05)
| Item | Amount |
|---|---|
| Gross cost, installed | CHF 38,000 |
| Cantonal grant M-05 | –CHF 5,000 |
| Subtotal after grant | CHF 33,000 |
| Tax deduction (marginal rate 27%) | –CHF 8,910 |
| Effective net cost | CHF 24,090 |
Option 2, geothermal heat pump (M-06)
| Item | Amount |
|---|---|
| Gross cost, heat pump and drilling | CHF 60,000 |
| Cantonal grant M-06 | –CHF 20,000 |
| Subtotal after grant | CHF 40,000 |
| Tax deduction (marginal rate 27%) | –CHF 10,800 |
| Effective net cost | CHF 29,200 |
Before grants, the gap between the two options is CHF 22,000. After the grant and tax deduction, it falls to about CHF 5,100, for a higher COP, a borehole lasting 50 years or more, and no outdoor unit (so no noise for the neighbours). The 27% marginal rate is an assumption: yours depends on your income and municipality.
Our recommendation for 2026
- Plan ahead. Start 6 to 12 months before the expected end of life of your current heating.
- Compare air-to-water and geothermal. With CHF 20,000 from M-06, drilling deserves a quote whenever the land allows it.
- Thermal assessment and CECB® before the quote. Do not sign without a heat loss calculation and an envelope rating check.
- Check with your municipality. One call to its energy department.
- Order nothing before written approval. No signed execution order, no equipment delivery.
A well-prepared heat pump project in Vaud, with every grant properly filed, is a sound financial decision. Poorly prepared, it means losing several thousand francs for nothing.