Aller au contenu principal
I.ON

Solar panel projectsin Western Switzerland.

Selection of installations completed by I.ON in the cantons of Vaud, Fribourg, Geneva and Neuchâtel. Residential, PPE and carports — between 4 and 30 kW depending on the project.

Eleven years of practice

More than 450 installations completed in Western Switzerland.

+450
Completed installations
+5 MWp
Cumulative capacity
96 %
Customer satisfaction
4 cantons
VD · GE · FR · NE
Residential solar panel installation in Puidoux, canton of Vaud
Residential · 2025

Family villa · Puidoux (VD)

24 panels · 20 kW
Residential solar panel installation in Forel, canton of Vaud
Residential · 2025

Detached house · Forel (VD)

46 panels · 8 kW
Solar panel installation on a condominium in Bussigny, Vaud
PPE · 2023

Condominium · Bussigny (VD)

Collective PPE · 30 kW · lead-acid storage
Solar panel installation on a condominium in Cottens, canton of Fribourg
PPE · 2025

Condominium · Cottens (FR)

Collective PPE · on-roof
Solar carport in St-Prex, Vaud
Solar carport · 2025

Residential carport · St-Prex (VD)

21 panels · 4 kW
Solar panel installation in Pringy, canton of Fribourg
Residential · 2025

Family home · Pringy (FR)

27 panels · 6 kW
Solar panel installation in Tannay, canton of Vaud
Residential · 2025

Integrated roof · Tannay (VD)

9 kW · lithium-ion storage
Residential solar panel installation in Cottens, Vaud
Residential · 2025

Detached house · Cottens (VD)

86 panels · 12 kW
Residential solar panel installation in Denges, Vaud
Residential · 2023

Detached house · Denges (VD)

6 kW · thin-film · lithium-ion storage
Solar panel installation in Sciernes, canton of Fribourg
Residential · 2023

Detached house · Sciernes (FR)

21 panels · 5 kW

Case studies

Three projects in detail.

Beyond the images: what we actually do, what it costs, what it produces, and how much it saves year after year.

180 m² family villa in Puidoux (VD)

Replacement of 1998 oil boiler + 12 kWp on-roof solar installation + coupling with Daikin Altherma air-to-water heat pump.

Gross investment
CHF 62,000
Cantonal subsidies
CHF 12,500
Tax deduction
CHF 13,400
Net effective cost
CHF 36,100
Annual savings
~CHF 3,200
Estimated ROI
11 years

House moved from EPC class E to class B. Heating carbon footprint divided by 4. Winter comfort significantly improved.

6-unit condominium in Bussigny (VD)

Collective 30 kWp solar installation with shared self-consumption (RCP) and buffer storage. Approved by a simple majority at the owners' assembly.

Total investment
CHF 68,000
Combined subsidies
CHF 16,500
Net after subsidies
CHF 51,500
Cost per unit
~CHF 8,600
Self-consumption
78%
Annual production
30 MWh

Common electricity charges reduced by 65% in the first year. All units agreed to join the RCP scheme, with automated monthly billing.

New build in Tannay (VD)

New construction with roof-integrated solar (9 kWp), geothermal heat pump (150 m boreholes), 10 kWh lithium-ion battery, EV charger coupled to solar.

Gross investment
CHF 118,000
Cantonal subsidies
CHF 16,000
Tax deduction
CHF 27,500
Net effective cost
CHF 74,500
Summer autonomy
100%
EPC class
A

Minergie-A certified building. Near-autonomous 8 months out of 12. Electric car charged primarily on solar surplus.

How we work

Three things we do differently.

We do not subcontract installation
The technicians who install your panels or heat pump are I.ON employees. No outsourced turnover, no diluted chain of responsibility. Our name is on the roof, and our team comes back if needed.
We say no when the project is not viable
A true north-facing roof, a roof in poor condition, a budget that does not cover quality installation: we say so during the site visit. It costs us jobs in the short term; it earns us trust in the long term.
We monitor production for 10 years
For solar installations, monitoring is included for 10 years. Any abnormal drop (panel, inverter, unanticipated shading) is detected and addressed. The performance we announced is the one we deliver.
Swiss landscape at sunset

Free quote

Free energy studyfor your home,no obligation.

On-site visit, consumption analysis, detailed cost simulation. Full quote delivered within seven days. If your project is not technically or financially viable, we tell you straight.

  • 7 daysDetailed quote turnaround
  • FreeOn-site study, no commitment
  • 100 %Subsidy applications handled for you
Prefer to talk? 0800 800 840

Study request

We will call you back within 48 hours.

By submitting this form, you agree to be contacted by our team. No data is shared with third parties.

Smarter Home