A certified heat pump
Up to 15 kW, the heat pump must be certified to the heat pump system module standard. Above that, a GSP “heat pump special solution” label, EHPA or an equivalent approved by the SFOE.
Category
Design, installation and grid connection. From residential to condominiums, with or without battery storage.
Open Smarter HomeCategory
Air-to-water, geothermal or water-to-water. Seasonal COP guaranteed at signing.
Open Smarter HomeCategory
Design-grade Daikin, Mitsubishi, Panasonic wall units. Quiet installation, permits handled.
Open Smarter HomeCategory
Store your solar production to use it in the evening. Consumption analysis, installation and 10-year monitoring.
Open Smarter HomeCategory
11 to 22 kW residential and fleet charging stations. Smart charging, driven by your solar output.
Open Smarter HomeCategory
Our projects in Western and German-speaking Switzerland, and a few of them in detail, backed by numbers.
Open Smarter HomeCategory
Practical guides, real costs and installer advice on energy in Western Switzerland.
See all articlesThe scale of the State of Geneva's GEnergie programme, the conditions of the cantonal energy office (OCEN) and the deadlines to meet when replacing oil, gas or electric heating.
2026 scale
M-05 · Air-to-water heat pump (≤ 70 kW)
Replacing oil, gas or electric heating
CHF 3,000 + CHF 400/kW
M-06 · Ground-source or water-to-water heat pump (≤ 70 kW)
Geothermal borehole, or a water source always above 5 °C
CHF 3,000 + CHF 800/kW
M-05 and M-06 bonus
Installing a heat meter
+ CHF 1,000
IP-05 · Air-to-water heat pump (> 70 kW)
Apartment and large buildings
CHF 4,000 + CHF 400/kW
IP-06 · Ground-source or water-to-water heat pump (> 70 kW)
Up to 500 kW
CHF 4,800 + CHF 800/kW
Output taken into account: heat pump output at A-7/W35, capped at 50 W per m². These measures cannot be combined with each other. Hydraulic balancing (MI-16) and replacing decentralised electric or fossil heaters (IP-19) are subsidised separately.
Worked example
Fictitious example: a house heated with oil, whose thermal study sets the need at 10 kW, with a heat meter installed.
The final amount depends on the output set after the study. The net investment after the grant is 100% deductible from taxable income.
Conditions
Up to 15 kW, the heat pump must be certified to the heat pump system module standard. Above that, a GSP “heat pump special solution” label, EHPA or an equivalent approved by the SFOE.
The installation complies with federal and cantonal noise rules. In the simplified procedure, a “heat pump noise circle” form validated by an acoustician is attached to the file.
The refrigerants used must be natural. A heat pump containing more than 3 kg is notified to the Federal Office for the Environment.
The file contains proof of sizing to SIA 384/1, a schematic diagram and a description of the controls. A hydraulic balancing report is handed over at the end of the work.
Procedure
Depending on the location and type of work, the heat pump follows a simplified procedure with the OCEN or a building permit with the building permits office.
Filed on the Building Programme platform for measures M-05 and M-06, at least 14 days before work starts.
Notice of start of work no later than 14 days before the work in the simplified procedure, 30 days with a building permit.
You have 24 months from the date the grant decision takes effect to carry out the work.
Hydraulic balancing report and end-of-work documents, then payment of the grant by the State of Geneva.
Frequently asked questions
CHF 3,000 + CHF 400 per kW up to 70 kW (measure M-05), plus CHF 1,000 if a heat meter is installed. For a 10 kW heat pump: CHF 7,000, or CHF 8,000 with the meter.
CHF 3,000 + CHF 800 per kW up to 70 kW (measure M-06), plus CHF 1,000 with a heat meter. For a 10 kW heat pump: CHF 11,000, or CHF 12,000 with the meter.
At least 14 days before the subsidised work starts. The work must then be carried out within 24 months of the grant decision taking effect.
Not always. If the project meets the location and work-type conditions, a simplified procedure with the OCEN is enough. Otherwise, a building permit is needed.
The SIG-éco21 programme offers its own heat pump grants, with specific conditions. Some Geneva municipalities also fund these measures. Check with them before signing.
Yes. The net investment, meaning the cost of the work minus the grant, can be 100% deducted from taxable income.
Sources: M-05, M-06, IP-05 and IP-06 fact sheets of the State of Geneva's GEnergie programme, “Pompe à chaleur” and “Subvention énergie pour les bâtiments” pages on ge.ch, consulted on 03.11.2026. For geothermal, see our page geothermal heat pump, and for neighbourhood rules our article on heat pump noise.
Learn more
Real 2026 heat pump prices by type and floor area in French-speaking Switzerland: gross costs, grants and effective net cost. Advice from I.ON Rolle (VD).
Read the articlePompe à chaleurReplacing an oil boiler with a heat pump in French-speaking Switzerland: procedures, costs, grants, timeline. The complete 2026 guide.
Read the articleHeat pumpSwiss noise ordinance limits, minimum distances to the neighbour's window, and what to do in a dispute. Vaud, Geneva and Fribourg rules compared for 2026.
Read the articlePompe à chaleurMost Swiss communes only require a simple notification for an air-water heat pump. When a building permit applies, how boreholes are licensed, canton by canton.
Read the articleFree quote
On-site visit, consumption analysis, detailed cost simulation. Full quote delivered within seven days. If your project is not technically or financially viable, we tell you straight.
Watt
I.ON assistant
AI assistant: it can be wrong. For a quote, an advisor takes over.