Greater Lausanne combines a large stock of detached villas (Mont-sur-Lausanne, Épalinges, Chailly, Vidy) with a substantial number of condominium buildings (PPE — the Swiss equivalent of freehold flats). A growing share of our recent projects involves collective self-consumption (RCP) on apartment buildings: solar production shared between co-owners, with individual metering and optimised internal billing.
Service area
Towns we serve — Greater Lausanne.
Lausanne
1003
Pully
1009
Le Mont-sur-Lausanne
1052
Épalinges
1066
Prilly
1008
Renens
1020
Crissier
1023
Bussigny
1030
Chavannes-près-Renens
1022
Ecublens
1024
Local context
What to know about energy in Greater Lausanne.
Climate & sunshine
1,500-1,650 hours of sunshine a year. Winter fog is common in the lower part of the agglomeration (Renens, Crissier, Vidy): production dips slightly in December and January, but the effect over the full year is marginal. Mild winters suit air-to-water heat pumps well.
Architecture & constraints
A very varied mix: suburban villas in the outer ring (Mont-sur-Lausanne, Épalinges, Cheseaux), 1960s-90s condominium buildings in the inner belt (Prilly, Renens, Ecublens), and larger apartment blocks in the centre. We tailor the strategy to each building type.
Grid & connection
Grid operators: Romande Energie (outer ring) and Services Industriels de Lausanne (SIL) for the city. Connection lead times of 4-6 weeks. SIL supports RCP (collective self-consumption groupings) with administrative assistance.
I.ON advice
Our recommendations for Greater Lausanne.
01
Collective self-consumption (RCP) for condominiums
On a condominium of 8 to 20 units, an RCP lets all co-owners share the building's solar production and sell the surplus internally (below grid rates). Typical payback of 6-9 years, versus 9-12 years for a standard grid feed-in. We handle the engineering, the RCP agreement and the individual meters.
02
Maximise self-consumption with an EV
EV commuters on the Lausanne ↔ Geneva / Bern routes get particular value from an 11 kW charger coupled to PV through a smart energy manager (EMMA, SolarEdge, Fronius Wattpilot). Solar charging takes priority during the day, topped up overnight at off-peak rates.
03
Pair insulation with a heat pump in 1970s villas
Many villas in Mont-sur-Lausanne and Épalinges date from the 1970s and were never insulated. Before fitting a heat pump, commission a CECB energy audit (the cantonal energy certificate): 10,000 CHF of roof insulation can halve the heat pump capacity you need and lift the COP by 30%.
2026 subsidies
Grants available in Greater Lausanne.
Pronovo one-off federal grant
Federal subsidy of 320-380 CHF/kWp for residential systems. An enhanced one-off grant applies to large condominium installations (>30 kWp).
Vaud + City of Lausanne bonuses
Canton Vaud and the City of Lausanne both offer PV and heat pump grants that can be combined. Condominiums receive a dedicated RCP bonus to encourage collective self-consumption.
Buildings Programme — energy upgrades
Federal and cantonal funding for replacing a fossil-fuel boiler with a heat pump: 4,000-12,000 CHF depending on capacity. Can be combined with insulation grants.
Exact amounts vary from year to year and depend on the specifics of each project. We always calculate the maximum combination of grants available when preparing your quote.
Frequently asked questions
FAQ — Greater Lausanne.
How does collective self-consumption (RCP) work for a condominium in Lausanne?
+
An RCP is a legal structure recognised under the federal Energy Act that lets the co-owners of a condominium jointly consume the building's solar production, with individual meters. Surplus production is sold to the grid (SIL or Romande Energie). We support the creation of the RCP, draft the agreement and install the metering infrastructure.
Can a 1970s villa in Épalinges switch to a heat pump?
+
Yes, in 90% of cases — provided the insulation is at least average. If the thermal envelope is weak, we start with a CECB audit (the official cantonal building energy certificate) to identify priorities. An investment in roof insulation + heat pump + PV often makes more financial sense than a heat pump alone.
How long from quote to commissioning in Lausanne?
+
10 to 14 weeks on average. SIL grid connections are slightly faster than Romande Energie (4-5 weeks versus 5-6). The on-site phase is similar in both cases: 2-4 days for residential PV, 1-2 weeks for a heat pump including removal of the old boiler.
On-site visit, consumption analysis, detailed cost simulation. Full quote delivered within seven days. If your project is not technically or financially viable, we tell you straight.