Plan ahead for a pool heat pump
Private pools are everywhere on La Côte. If you are installing PV now, size in an extra 1.5 to 2 kWp to cover a future pool heat pump — it will save you a second extension three years down the line.
Category
Design, installation and grid connection. From residential to condominiums, with or without battery storage.
Open Smarter HomeCategory
Air-to-water, geothermal or water-to-water. Seasonal COP guaranteed at signing.
Open Smarter HomeCategory
11 to 22 kW residential and fleet charging stations. Smart charging, driven by your solar output.
Open Smarter HomeCategory
Design-grade Daikin, Mitsubishi, Panasonic wall units. Quiet installation, permits handled.
Open Smarter HomeCategory
Practical guides, real costs and installer advice on energy in Western Switzerland.
See all articlesVaud · 0 to 25 km from Rolle
Nyon, Morges, Rolle, Gland, Aubonne — our home territory.
La Côte is where we work every single day. Our depot and our crews are based in Rolle, right in the heart of the district. We deliver around a hundred installations here each year — family homes, condominiums, vineyards, farms — everywhere between Coppet and Allaman. Being this close means we can be on site within 24 hours whenever one of our installations needs attention, with no call-out charge.
Service area
Local context
Mild lakeside microclimate on Lake Geneva: 1,500 to 1,700 hours of sunshine a year and gentle winters (-2°C on average). Solar payback here is among the best in Switzerland for this latitude. Air-to-water heat pumps run at full efficiency all year round with no significant electric backup.
A mix of detached villas, condominiums and winery buildings. Many gabled and hipped roofs face south or west thanks to the natural slope down to the lake. A few protected villages (Bursins, Mont-sur-Rolle) call for a discreet installation: in those cases we favour full-black panels or in-roof (integrated) systems.
Grid operator: Romande Energie. Typical grid-connection lead time: 3 to 6 weeks after the application is filed. Good feed-in capacity across nearly the entire district.
I.ON advice
Private pools are everywhere on La Côte. If you are installing PV now, size in an extra 1.5 to 2 kWp to cover a future pool heat pump — it will save you a second extension three years down the line.
The wine-growing communes (Bursins, Féchy, Mont-sur-Rolle, Tartegnin) grant permits far more readily when the panels are integrated into the roof rather than mounted on top. The cost difference (~10%) is offset by a much cleaner look.
With daily commutes between La Côte and Geneva or Lausanne, an 11 kW charger coupled to your PV system pays for itself remarkably fast (3 to 4 years). Have the SG-Ready wiring put in when the PV goes up.
2026 subsidies
Federal subsidy for any new PV installation: roughly 320-380 CHF/kWp for small systems (<30 kWp), paid out once after commissioning. For an 8 kWp system: ~3,000 CHF.
Canton Vaud pays a subsidy on top of the Pronovo grant for PV systems, plus heat pump grants through the Buildings Programme. Typical amounts of 800-2,500 CHF per project, which can be combined with municipal grants.
The net cost after subsidies is deductible from your taxable income as an energy investment. Typical tax saving of 25-35% of the net amount, depending on your marginal rate.
Exact amounts vary from year to year and depend on the specifics of each project. We always calculate the maximum combination of grants available when preparing your quote.
Frequently asked questions
Yes. Every commune on La Côte (the districts of Nyon and Morges) sits within our priority service area around our Rolle headquarters. No travel charges for quotes or for warranty call-outs.
Allow 8 to 12 weeks after accepting the quote for a standard residential solar installation. That covers ordering the equipment, the Romande Energie grid-connection application (3-6 weeks) and the installation itself (2-4 days).
For an average consumption of 4,500-6,000 kWh/year, we typically size 7 to 10 kWp. If a heat pump or an electric car is on the cards, we go up to 10-14 kWp to keep self-consumption high.
Our services
Other regions we serve
Free quote
On-site visit, consumption analysis, detailed cost simulation. Full quote delivered within seven days. If your project is not technically or financially viable, we tell you straight.
A question?